Bridge-to-grid
Generation for the period before the planned grid supply is available, with a defined transition strategy.
We develop power options for data-centre projects, connecting generation equipment with the engineering and commercial arrangements required for the intended operating duty.
Generation for the period before the planned grid supply is available, with a defined transition strategy.
Generation planned around the facility’s continuing electricity requirement.
Assess how generation and grid supply can work together within the proposed operating arrangement.
We distinguish generation capacity, power deliverable to the facility and IT capacity.
Equipment condition, operating conditions, auxiliary demand, maintenance and redundancy all inform the design. The proposal states the capacity basis and the assumptions behind it.
We design fuel supply, generation, electrical distribution, maintenance and outage response as one system.
Storage, backup arrangements and grid interaction are assessed against the facility’s requirements. Efficiency, emissions-control needs and permitting requirements are assessed for the proposed configuration and location.
The commercial scope can cover equipment procurement, generation-project development or a power-supply arrangement.
Each proposal identifies the asset owner, development scope, operating responsibilities and commercial terms.
The load profile, generation configuration, deliverable capacity, fuel assumptions, reliability approach, operating costs and delivery dependencies.
Submit power requirementsNeed equipment for your own project? Explore Turbines.