Campus development
Plan the site and facility around the capacity, configuration and operating requirements of the deployment.
We assess existing generation sites and other suitable locations for AI infrastructure, bringing land, power, cooling, connectivity and development requirements into one plan.
Plan the site and facility around the capacity, configuration and operating requirements of the deployment.
Explore space, power, cooling and connectivity for customer-owned hardware.
Structure the first deployment and later phases around defined capacity and infrastructure milestones.
Deliverable electricity, fuel arrangements, electrical infrastructure and expansion potential.
Usable area, access, development rights and approvals for the intended use.
Rack density, heat rejection, liquid-cooling needs and local water and climate constraints.
Fibre availability, diverse routes and workload-specific latency requirements.
Equipment access, construction sequence, commissioning and operating responsibilities.
An existing generation site can give a project a head start. A new location is selected when it better matches the requirement.
We compare both against the proposed deployment and the work required to make the site suitable.
The proposed location, initial and expandable IT capacity, electrical and cooling concept, connectivity requirements, development scope and staged delivery plan.
Opportunity-specific information is shared privately with qualified counterparties.
Submit campus requirementsNeed generation for a site you already control? Explore Power.